| Particulars |
Last
date of sale |
Last
date of submission |
|
Installation of F& L Pump water tank
|
21.09.2010
|
22.09.2010 at 3.30 pm.
|
|
Designing (AESTHETICALLY) Construction of R.C.C |
22.09.2010
|
23.09.2010 at 3.30 pm.
|
|
Reinstallation of water treatment plant |
21.09.2010
|
22.09.2010 at 3.30 pm.
|
|
Construction of Tube Well |
23.09.2010
|
26.09.2010 at 4.00 pm.
|
|
Construction of Mini Rural Water
Supply Scheme |
20.09.2010
|
27.09.2010 at 3.30 pm.
|
|
Installation of F/L Pump |
21.09.2010
|
22.09.2010 at 3.30 pm.
|
|
Reinstallation of water treatment plant |
20.09.2010
|
21.09.2010 at 3.30 pm.
|
|
Changing in force and lift pump |
20.09.2010
|
21.09.2010 at 3.30 pm.
|
|
Installation of lift pumps |
20.09.2010
|
21.09.2010 at 3.30 pm.
|
|
Reinstallation of Water Treatment Plant |
20.09.2010
|
21.09.2010 at 3.30 pm.
|
|
Supplying and
installation of Submersible pump |
14.09.2010
|
15.09.2010 at 3.30 pm.
|
|
Construction of water treatment plant |
28.08.2010
|
30.08.2010 at 3.30 pm.
|
|
Construction of cannel |
23.08.2010 at 5.00 pm.
|
24.08.2010 at 3.30 pm.
|
|
Construction of Infrastructure rain water
harvesting |
16.08.2010 at 5.00 pm.
|
17.08.2010 at 3.30 pm.
|
|
Replacement of Riser Pipe, connecting rode
|
29.07.2010 at 5.00 pm.
|
30.07.2010 at 1.30 pm.
|
|
Conversion of T/Well from from III to IM-II |
28.07.2010 at 5.00 pm.
|
29.07.2010 at 3.30 pm.
|
|
Replacement of Water Treatment Plant |
26.07.2010 at 5.00 pm.
|
27.07.2010 at 3.30 pm.
|
|
Replacement of Water Treatment Plant |
26.07.2010 at 5.00 pm.
|
27.07.2010 at 3.30 pm.
|
|
Replacement of Water Treatment Plant |
26.07.2010
|
27.07.2010 at 3.30 pm.
|
|
Construction of Water Treatment Plant |
26.07.2010 at 5.00 pm.
|
27.07.2010 at 3.30 pm.
|
|
Providing Rising and Distribution mains on Turn Key Basis |
22.07.2010 at 5.00 pm.
|
23.07.2010 at 3.30 pm.
|
|
Construction
of Drinking Water |
19.07.2010 at 5.00 pm.
|
20.07.2010 at 3.30 pm.
|
|
Operation and Maintenance of Water Treatment Plant with back recovery
system |
21.07.2010 at 5.00 pm.
|
23.07.2010 at 2.30 pm.
|
|
Construction of structure rain water harvesting |
26.07.2010 at 5.00 pm.
|
27.07.2010 at 3.30 pm.
|
|
Construction of Tube well
|
14.07.2010 at 5.00 pm.
|
15.07.2010 at 3.30 pm.
|
|
Extension of Riser Pipe
|
07.07.2010 at 5.00 pm.
|
08.07.2010 at 4.00 pm.
|
|
Construction of Water Treatment Plant
|
14.07.2010 at 5.00 pm.
|
15.07.2010 at 3.00 pm.
|
|
Pipeline work
|
14.07.2010
|
16.07.2010 at 4.00 pm.
|
|
Construction
of Drinking Water
|
07.07.2010 at 5.00 pm.
|
08.07.2010 at 3.30 pm.
|
|
Construction
of Drinking Water
|
05.07.2010 at 5.00 pm.
|
06.07.2010 at 3.30 pm.
|
|
construction
of intake well
|
07.06.2010
|
08.06.2010 at 3.30 pm
|
|
Construction
of Drinking Water
|
25.05.2010
|
26.05.2010 at 3.30 pm
|
|
Construction
of Drinking Water
|
30.04.2010
|
03.05.2010 at 3.30 pm
|
|
Construction
of Drinking Water
|
26.03.2010
|
27.03.2010 upto 3.30 pm
|
|
Construction
of Intake well cum Raw water Pump House
|
------
|
---------
|
|
Constructions
of Water Treatment Plant
|
27.10.09
|
29.10.09 up to 4.30 pm
|
|
Surveying,
Engineering Studies, Designing
|
19.10.09 up to 5.00 pm.
|
27.10.09 up to 3.30 pm
|
|
Construction
of Drinking Water
|
13.10.09 up to 5.00 pm.
|
16.10.09 up to 3.30 pm
|
|
Construction
of Drinking Water
|
17.09.09 at 5.00 pm.
|
18.09.09 at 3.30 pm
|
|
Details
Surveying Engineering Studies Designing of RCC Intake well with Pump
House
|
07.08.09 at 5.00 pm.
|
13.08.09 at 3.30 pm
|
|
Details
survey, design, construction commissioning on turn-key basis
|
18.07.09 at 5.00 pm.
|
22.07.09 at 3.00 pm
|
|
Construction
of Drinking Water
|
16.06.09
|
17.06.09 at 4.30 pm
|
|
Construction
of Drinking Water
|
16.06.09 at 5.00 pm.
|
17.06.09 at 3.30 pm
|
|
Construction
of Drinking Water
|
16.06.09 at 5.00 pm.
|
17.06.09 at 3.30 pm
|
|
Details
survey, design, construction commissioning on turn-key basis under
Bishrampur Rural Pipe Water Supply Scheme
|
03.06.09 upto 5.00 pm.
|
08.06.09 at 03.30 pm
|
|
Improved
quality of drinking water to school children
|
--------
|
11.06.09 at 03.00 pm
|
|
Details
Surveying Engineering Studies Designing of RCC Intake well with high
pump
|
02.06.09 upto 5.00 pm.
|
06.06.09 at 11.00 pm
|
|
Details
Surveying Engineering Studies Designing of Water Treatment Plant
|
03.06.09 upto 5.00 pm.
|
08.06.09 upto 3.30 pm
|
|
Surveying,
Engineering Studies, Designing and Construction of
RCC Intake well with high Pump House, Infiltration Gallery
|
18.03.09 upto 5.00 pm.
|
24.03.09 upto 3.30 pm
|
|
Surveying, Engineering Studies Designing and Construction of 5.5 MLD capacity Water Treatment Plant
|
05.03.09 upto 5.00 pm.
|
13.02.09 upto 3.30 pm
|
|
Construction
Commissioning on turn-key basis under Bishrampur Rural pipe water supply
|
11.02.09 upto 5.00 pm.
|
12.02.09 upto 3.00 pm
|
|
Construction
of Drinking Water
|
28.01.09
|
29.01.09 at 4.00 pm
|
|
Details
Surveying, Engineering Studies Designing and Construction of 9 MLD capacity Water Treatment Plant
|
02.02.09 at 5 pm.
|
11.02.09 at 3.30 pm
|
|
Details
Surveying, Engineering Studies Designing and Construction of 5.5 MLD capacity Water Treatment Plant
|
28.01.09 at 5 pm
|
07.02.09 at 3.30 pm
|
|
Details
Surveying, Engineering Studies Designing and Construction commissioning
and successfully of 6.0 MLD capacity Water Treatment Plant
|
28.01.09 at 5 pm
|
03.02.09 at 4.30 pm
|
|
Construction
of Drinking Water
|
08.01.09
|
09.01.09 at 4.30 pm
|
|
Construction
of Drinking Water
|
10.01.09 at 11.00 am.
|
15.01.09 at 3.00 pm
|
|
Designing and Construction
of R.C.C Intake Water
Treatment Plant
|
30.12.09 upto 5.00 pm.
|
05.01.09 at 3.30 pm
|
|
Surveying,
Engineering Studies Designing and Construction of 10 MLD capacity Water
Treatment Plant
|
30.12.09 upto 5.00 pm.
|
05.01.09 at 3.30 pm
|
|
Supply
of 32mm G.I. (medium) Riser Pipe
|
05.01.09
|
06.01.09 at 3.30 pm
|
|
Supply
of I.S.I. Mark Centrifugally Cast (spun) Ductile iron pressure pipes
|
05.01.09
|
06.01.09 at 3.30 pm
|
|
Construction
Work of Dam
|
18.11.08 to 25.11.08
|
26.11.08 at 3.00 pm
|
|
Construction
of Canals
|
12.11.08 to 18.11.08
|
19.11.08 at 3.00 pm
|
|
Construction
Work of Dam
|
11.11.08 to 17.11.08
|
18.11.08 at 3.00 pm
|
|
Construction
Commissioning and successfully of 6.0 MLD capacity Water Treatment Plant
|
11.11.08 upto 5.00 pm.
|
21.11.08 upto 3.30 pm
|
|
Surveying,
Engineering Studies Designing and Construction of R.C.C. Intake cum
Infiltration well
|
30.10.08 upto 5.00 pm.
|
11.11.08 upto 3.30 pm
|
|
Construction
of R.C.C. Intake well cum pump house with Gangway
|
29.10.08
|
31.10.08 upto 3.30 pm
|
|
Development
and printing of communication materials related to TSC, water quality
monitoring & surveillance programme
|
------
|
28.10.08 by 4.00 pm
|
|
Supplying
and laying of 250mm dia C.I. Class-LA and 250mm dia D.I. K-9 Rising main
from Pakur railway gate to Chandpur pumping plant including construction
of R.C.C. thrust block,
|
14.10.08 upto 5.00 pm.
|
22.10.08 at 3.30 pm
|
|
Details
Surveying Engineering Studies Designing and Construction of 1.70 MLD
capacity Water Treatment Plant
|
01.10.08 upto 5.00 pm.
|
17.10.08 at 3.30 pm
|
|
Details
Surveying Engineering Studies Designing and Construction of 1.70 MLD
capacity Water Treatment Plant
|
01.10.08 upto 5.00 pm.
|
17.10.08 at 3.30 pm
|
|
Construction
of Water Pumps
|
24.09.08 upto 4.00 pm.
|
25.09.08 at 4.00 pm
|
|
HESE
PORA WATER SUPPLY Drinking Water & Sanitation Division
|
23.09.08 upto 5.00pm.
|
24.09.08 upto 3.30 pm
|
|
Drinking
Water & Sanitation Circle
|
23.09.08 upto 5.00pm.
|
24.09.08 upto 3.30 pm
|
|
Supply
and construction work of water treatment plant
|
18.09.08
|
19.09.08 upto 15.30 pm
|
|
Construction
of water treatment plant, Jack well etc.
|
22.09.08 upto
17.00
|
26.09.08 upto 15.30 pm
|
|
Construction
of Water Pumps
|
09.09.08 upto 4.00
pm
|
10.09.08 upto 3.30 pm
|
|
Supplying
and laying of 250mm dia C.I. Class-LA and 250mm dia D.I. K-9 Rising main
from Pakur railway gate to Chandpur pumping plant
|
25.08.08 upto 5.00
pm
|
04.09.08 at 4.00 pm
|
|
Supplying
and laying of 250mm dia C.I. Class-LA and 250mm dia D.I. K-9 Rising main
from Pakur railway gate to Chandpur pumping plant
|
25.08.08 upto 5.00
pm
|
04.09.08 at 4.00 pm
|
|
Engineering
Studies Designing and construction of Water Treatment Plant
|
21.08.08 upto 5.00
pm
|
25.08.08 at 3.30 pm
|
|
Desiltation
work of Kanke Dam
|
04.08.08 upto 17.00
hrs
|
11.08.08 at 3.30 pm
|
|
Construction
of Elevated Service Reservoir
|
08.08.08 upto 17.00
hrs
|
14.08.08 at 3.30 pm
|
|
Construction
of Water Treatment Plant
|
07.08.08 upto 17.00
hrs
|
14.08.08 at 3.30 pm
|
|
Construction
of Infiltration well with Infiltration gallery
|
08.08.08 upto 17.00
hrs
|
14.08.08 at 3.30 pm
|
|
Construction
of Water Pumps
|
28.07.08
|
29.07.08 at 4.30 pm
|
|
Construction
of Canals
|
04.08.08 at 4.00 pm
|
05.08.08 at 4.30 pm
|