1.
Officer Inviting Tender /Bid
:
Executive Engineer
Rural Development Special Division
Simdega
2.
PERIOD OF SALE OF
: FROM:
11.07.2008
TENDER
DOCUMENT TO
: 14.07.2008
during Office Hours
3.
LAST DATE AND TIME FOR
:
DATE
: 15.07.2008
RECEIPT OF BIDS
TIME
: 15.00 HOURS (3.00 PM)
4.
TIME AND DATE OF OPENING:
DATE
: 15.07.2008
TENDER/BID
TIME
: 16.00 HOURS (4.00 PM)
5.
PLACE FOR SALE OF TENDER/BID :
Chief Engineer’s Office
Rural Development Special Zone
FFP Building, Dhurwa, Ranchi
§
Superintending Engineer’s Office
Rural Development Special Circle
Ranchi
§
Executive Engineer’s Office
Rural Development Special Division
Simdega
6.
PLACE FOR RECIEPT &:
:
District Control Room Ranchi
OPENING OF TENDER / BID
7.
Name
of Works :
| |
Sl.
No.
|
Name
Of Bridge
|
Total
Length of Bridge
|
Earnest
Money
|
Cost
of BID document
|
Time
Of Completion
|
|
1
|
Package
No. 1
|
|
|
|
|
|
|
i)
Construction of RCC Bridge across
River Ghaghra (Girima) in Biru – Ghaghra (Japkakona)
Road under Simdega Block – Length -152.16 M
ii)
Construction of RCC Bridge across
River Shankh in
Pakartanr – Kochedega Road under Simdega Block
– length – 304.32 M
iii)
Construction of RCC Bridge across Sukhajharia (
Samarsingha) Nala
in Khira – Rengari R.E.O. Road under Simdega
Block – length -75.59 M
iv)
Construction of RCC Bridge across River Shankh in
Karjitanr – Thethaitanger to Banspahar –Kochedega Road
under Simdega Block – length -304.32 M
v)
Construction of RCC Bridge across river in Koronjo
to Dumki Road under Thethaitanger Block – length –
225.98 M
vi)
Construction of RCC Bridge across Kadma Nala in
Konpala Panchayat under Thethaitanger Block – length –
111.84 M
vii)
Construction of RCC Bridge across River Chinda in
Dumki to Churia –Uria – Basa Road under Thethaitanger
Block – length -
253.60 M
viii)
Construction of RCC Bridge across River Kusumajore
in Basen to Bagdanga (Bagbera) Road near Rambera (Raibera)
under Kurdeg Block – length -39.37M
ix)
Construction of RCC Bridge across
River Kusumajore in Kurgeg R.E.O. Road from
Chauratanr (Chhatitoli) to Ambakona Road
under Kurdeg Block –length – 39.37M
x)
Construction of RCC Bridge across River Khalijore
in Kesutoli – Konjoba
Road under Kurdeg Block – Length – 60.48 M
|
1567.03
M Approach Road 40680M Carriage Width 7.50M
G.
Wall 890 M
Culverts
6 Nos.
|
Rs.
65.56 Lacs
|
Rs.
10000/-
|
24
Months
|
|
2.
|
Package
No. 2
i)
Construction
of RCC across Sargartuta Nala
in NH 23 –Kolebira to Chhapridih via Sundartoli
Road under Kolebira Block – length 32.30 M
ii)
Construction
of RCC Bridge across River Lurgi
in Bansjore –NH to Ginikera Road under Jaldega
Block length – 60.48M
iii)
Construction
of RCC Bridge across River Kurkura in Kurkura–Darkapani
Road under Jaldega Block- length – 60.48M
iv)
Construction
of RCC Bridge across River Lurgi in Baraibera to Tekra
Road under Jaldega Block – length – 90.70 M
v)
Construction
of RCC Bridge across Chutia Nala near Hazaribera in
Lachragarh Panchayat under Kolebira Block – length –
75.34 M
vi)
Construction
of RCC Bridge across river from BT Road
to Tangertoli Road in Adharma Panchayat under
Kolebira Block – Length – 51.37M
vii)
Construction
of RCC Bridge across River Deo in Kundudega Road under
Kolebira Block–length– 58.12M
|
428.79
M Approach Road 29400 M
Carriage Width 7.50M
G.
Wall – 730M
Culvert
– 2 Nos.
|
Rs.
28.45 Lacs
|
Rs.
10000/-
|
18
Months
|
|
3.
|
Package
No. 3
|
|
|
|
|
|
|
i)
Construction
of RCC Bridge across River Koel in Hurpi to W. Singhbhum
Road under Bano Block –Length – 239.58M
ii)
Construction
of RCC Bridge across River Koel in Panchayat Berargi to
rania Road under Bano Block – length -
304.36M
iii)
Construction
of RCC Bridge across Dongaghat Nala in R.E.O. Road under
Bano Block – length – 75.34 M
iv)
Construction
of RCC Bridge across Luguntoli Nala from Raikera under
Bano Block –length – 96.86 M
|
716.14
M Approach Road 15000M Carriage Width 7.50M
|
Rs.
30.75 Lacs
|
Rs.
10000/-
|
18
Months
|
8.
Estimated cost may increase or decrease.
9.
Earnest Money needs to be attached in form of 8/6 year
NSC (8th issue) from the post office of Jharkhand or 3/5 years
post office time deposit or Bank Guarantee of any nationalized
schedule bank valid upto 2
Years (Two years from
the date of opening of Technical Bid) (in prescribed format)
pledged in favour of Executive Engineer, Rural
Development Special Division, Simdega .
10.
The contractors registered in REO/PWD (Roads) in
appropriate class may participate in this tender.
11.
Tenderer or his authorised representative may be present
at the time of opening of Technical Bid/ tender.
12.
The price of BID/Tender document mentioned above is
non-refundable but should be in the form of Bank Draft in favour
of Executive Engineer, Rural Development Special Division,
Simdega payable at
S.B.I. Simdega .
13.
The work is to be done on "Turn Key Basis" The
DPR drawing etc. available in the department may be seen in the
office of the undersigned on
any working day for reference only. The contractor, however, is
required to make his own design and drawings based on his own
survey, investigations etc. at site which will have to be
approved by the Chief Engineer, Rural Development Special Zone,
Ranchi.
14.
Tenderers are advised to visit the bridge site (on their
own cost) to study the details and conditions of works site.
15.
Tender is based on “Two Envelope System” of
“Technical” and “Financial” bids. Financial bids of only
technically qualified contractors shall be opened.
16.
The undersigned reserves the right to accept or reject
any tender without assigning any reason.
17.
The details of the Terms and Conditions of the tender may
be seen in Tender/Bid Document.
18.
The department will not supply/provide any construction
equipment and materials such as road roller, cement, steel etc.
19.
Work has to be executed on the basis of guidelines and
provisions of MOST Specifications and IRC guidelines.
20.
The Contractor is required to establish his own fully
equipped and functional Quality Control Laboratory at the work
site before execution of the work for Quality Control Tests.
21.
The contractor shall be responsible for any damage or
loss to the public property due to negligence of their labour
and staff and the damage / loss should be made good at his own
cost.
22.
The contractor should get the sample of all materials
approved by the Engineer in Charge before collecting them to be
used in work.
23.
The contractor have to submit the work programme / mile
stones for the
completion of work within the specified
time period and the
progress of the work should be strictly maintained
according to the programme so as to complete the work in time.
24.
The contractor should be held responsible for materials
at site.
25.
Payment shall
be made only on the availability of allotment by the department.
26.
Tenderers must
have minimum
experience of bridge work of total length for Package No. (1)
800 M, for Package No. (2) 215. M and for Package No. (3) 360 M, respectively having Raft/Well/Pile/Open (Type of
foundation etc.).
27.
Technical qualifications of the tenderers will be
considered only after Qualifying the Standard of Tools &
Plants and Bid capacity each.
28.
The allotment of work shall not be considered to those
contractors whose previously allotted works are pending OR their
works are not considered satisfactory in the Department.
29.
After the work is allotted to the contractor, the work
cannot be sublet by him as per conditions of the agreement
otherwise that would be treated as violation of conditions of
the agreement. If such information is received, the agreement
will the cancelled and the procedure of blacklisting shall be
initiated accordingly against the defaulter.
30.
The allotment of work shall be considered on the basis of
work load of a tenderer under Rural Development Department (R.E.O.+
M.M.G.S.Y.) and present availability of tools & plants and
financial capacity of the tenderer.
The
consultancy charge @ 1% of the DPR cost will be deducted from
the First On Account Bill of the contactor. The contractor shall
not be paid in this item separately.
Executive
Engineer
Rural
Development Special Division
Simdega
|