GOVERNMENT OF JHARKHAND
EXECUTIVE ENGINEER,
RURAL DEVELOPMENT SPECIAL DIVISION, GUMLA
NOTICE INVITING TENDER No. 1/2008-09
(TWO
ENVELOPE SYSTEM)
|
|
|
1.
Officer
inviting Tender/Bid |
:
Executive
Engineer,
Rural Development Special Division,
Gumla |
|
2.
PERIOD
OF SALE OF
TENDER DOCUMENT |
:
FROM 21.04.08
TO 29.04.2008
(during office Hours) |
|
3.
LAST
DATE AND TIME FOR RECEIPT OF BIDS |
:
DATE 30.04.08
TIME: 15.00 HOURS (3.00 PM) |
|
4.
TIME
AND DATE OF OPENING
TENDER/BID |
:
DATE
30.04.08
TIME: 16.00 HOURS (4.00 PM)
|
|
5.
Place for Sale of Tender/ Bid document |
:
1)
Chief Engineer Office,
Rural Development Special Zone,F.F.P.
building, Ranchi
2) Superintending Engineer’s Office,,
Rural
Development Special Circle,
Ranchi
3) Executive Engineer’s Office, Rural Development Special Division, Gumla
|
|
6.
PLACE
FOR RECIEPT &
OPENING OF
TENDER/BID |
:
District
Control Room Ranchi
|
|
7.
Name
of works |
:
|
|
Pkg.
No. |
Name
of Work |
Length
of Bridge |
Earnest
Money |
Cost
of BID document |
Time
of completion |
Minimum
Experience of Bridge length for contractor |
|
1. |
i)
Construction of High Level Bridge over Banki river on Phori to Konpa road
under Gumla Block
in Gumla District.(L= 152.19M)
ii) Construction of High Level Bridge over Kulabira river on PMY road
Kulabira to NH23 Shilaphari road under Gumla Block in Gumla District. (L= 79.74M) |
231.93M
Approach
Road 400 M (2X2X100m) Carriage Width 7.50 M
|
7.66 Lacs |
Rs. 10000 |
15 Months |
116M |
|
2. |
Construction of High Level
Bridge over Konji
river under Dumri Block
in Gumla District. |
87M (approx)
Approach
Road 200 M (2X100m) Carriage Width 7.50 M |
2.60 Lacs |
Rs. 10000 |
12 Months |
50M |
|
3. |
i)
Construction of High Level
Bridge over Karam Boha Torpa river on Tillaiyadih
to Raikera road under Palkot Block at Nathpur
panchayat in
Gumla District.
ii)
Construction of High Level
Bridge over Nirjhar
river on Pakarthrdh to Pani Sani road d under
Palkot Block at Bangru panchayat
in Gumla District.
(L=71.47M)
(L=106.89M) |
178.36M
Approach
Road 400 M (2X2X100m) Carriage Width 7.50 M
|
6.55 Lacs |
Rs. 10000 |
12 Months |
90M |
|
4. |
Construction of High Level
Bridge over Sankh river on Kedeg to Jairagi road
under Chainpur Block
in Gumla District. |
92.62 M
Approach
Road 200 M (2X100m) Carriage Width 7.50 M |
2.60 Lacs |
Rs. 10000 |
12 Months |
50M |
|
5. |
Construction of High Level
Bridge over North Koel
river on Bishunpur – samdari – Netarhat
road near Ail in Bishunpur Block
in Gumla District. |
92.62 M
Approach
Road 200 M (2X100m) Carriage Width 7.50 M |
3.11 Lacs |
Rs. 10000 |
12 Months |
50M |
|
6. |
Construction of High Level Bridge over South Koel river on Balkhtanga to
Lorango road in Sisai Block in Gumla District. |
171.94M
Approach
Road 200 M (2X100m) Carriage Width 7.50 M |
4.92 Lacs |
Rs. 10000 |
12 Months |
75M |
|
|
|
8.
Estimated cost may be increase
or decrease
9. Earnest Money needs to be attached in form of 8/6 year NSC (8th
issue) from the post office of Jharkhand or 3/5 years post
office time deposit pledged in favor of Executive Engineer.
Rural Development Special Division, Gumla.
10. The contractors registered in REO/PWD (Roads) in appropriate class may
participate in this tender.
11. 10
Tendered or his authorized
representative may be present at the time of opening of
Technical Bid/tender.
12. The price of Bid/Tender document mentioned above
is non – refundable but should be in the form of bank
draft in favor of Executive
Engineer ,Rural Development Special Division,Gumla payable at
S.B.I. Gumla.
13. The work is to be done on “ Turn Key Basis “ the DPR drawing etc.
available in the department may be seen in the office of the
undersigned on any working day for reference only. The
contractor, however, is required to make his own design and
drawings based on his own survey, investigations etc. at site
which will have to be approved by the Chief Engineer, Rural
Development Special Zone, Ranchi.
14.
Tenderers are advised to visit
the bridge site ( on their own cost ) to study the details and
conditions of works site.
15. Tender is based on “ Two Envelope System “ of “ Technical “ and
“ Financial “ bids. Financial bids of only technically
qualified contractors shall be opened.
16. The undersigned reserves the right to accept or reject any tender without
assigning any reason.
17. The details of the Terms and Conditions of the tender may be seen in
Tender/Bid Document.
18. 10
The department will not
supply/provide any construction equipment and materials such
as road roller, cement, steel etc.
19. Work has to be executed on the basis of guidelines and provisions of MOST
Specifications and IRC guidelines.
20. The Contractor is required to establish his own fully equipped and
functional Quality Control Laboratory at the work site before
execution of the work for Quality Control Tests.
21.The contractor shall be responsible for any damage or loss to the public
property due to negligence of their labor and staff and the
damage/loss should be made good at his own cost.
22. The contractor should get the sample of all materials approved by the
Engineer- in -charge before collecting them to be used in
work.
23. The contractor have to submit the work programme/mile stones for the completion of work within the
specified time period and the progress of the work should be
strictly maintained according to the progamme so as to
complete the work in time.
24.The contractor should be held
responsible for materials at site.
25.
Payment shall be made only on the availability of allotment by the
department.
26. Tenderers must have experience of bridge work as indicated in col.7.
27. The cost of preparation of PPR/DPR will be deducted from the first On
Account bill of the contractor.
28. Technical qualifications of the tenderers will be considered only after qualifying the standard of
tools & plants and Bid capacity each.
29. The allotment of work shall not be considered to those contractors whose
previously allotted works are pending OR their works are not
considered satisfactory in the Department.
30. After the work is allotted to the contractor, the work cannot be sublet
by him as per conditions of the agreement otherwise that would
be treated as violation of condtions of the agreement. If such
information is received, the agreement will the cancelled and
the procedure of black listing shall be initiated accordingly
against the defaulter.
31. The allotment of work shall be considered on the basis of work load of a
tenderer under Rural Development Department (R.E.O. +
M.M.G.S.Y.) and present availability of tools & plants and
financial capacity of the tenderer.
32. The consultation fees @ 1% of the DPR will be deducted from the First On
Account Bill of the contactor. The contractor shall not be
paid in this item separately.
|
|
Executive Engineer
Rural Development Special Division,
Gumla
|
|
|
IPRD-
22363 (R.E.O.) 08-09
|
|